Terms & Conditions

Data Security

We are committed to ensuring that your information is secure. In order to prevent unauthorised access or disclosure we have put in place suitable physical, electronic and managerial procedures to safeguard and secure the information we collect.

All data is stored in secure electronic systems accessible only to Oasys staff with both valid network login credentials and specific authorisation to access the system.  Our systems further limit data access by role to ensure data is available only to those who have a specific need to see it.

If at any point you suspect or receive a suspicious communication from someone suggesting they work for Oasys or a website claiming to be affiliated with Oasys, please forward the communication to us or report the incident by email to [email protected] or in writing to Oasys, 8 Fitzroy Street, London, UK, W1T 4BJ as soon as possible.

Data Security Notice Updated 27th February 2020

top ]


 

Website Terms and Conditions

The contents of this web site are protected by copyright and other intellectual property rights under international conventions. No copying of any words, images, graphic representations or other information contained in this web site is permitted without the prior written permission of the webmaster for this site.

Oasys accepts no responsibility for the content of any external site that links to or from this site.

top ]

 


 

Software Licensing Terms

Terms and Conditions of Purchase

The full conditions of purchase and maintenance for all Oasys desktop software are set out in the Oasys Software Licence and Support Agreement.

The full conditions of purchase and maintenance for Oasys Gofer and Oasys Giraphe are set out in the Gofer SaaS Agreement  and the Giraphe SaaS agreement.

All prices are subject to TAX at the current rate.

Prices and specifications are subject to change without notice – please ask for a written quotation.

Although every care has been taken to ensure the accuracy of all information contained herein, the contents do not form or constitute a representation, warranty, or part of any contract.

Superseded Versions of Terms and Conditions

Oasys keeps copies of all superseded versions of its terms and conditions.

Maintenance & Support Services

Support and maintenance is included with all subscription licences for their full duration.

Annual maintenance contracts are available for software under a perpetual licence, prices are based on a percentage of the most recent list price.

This service includes:

 

top ]

 


 

Cookies Policies

View available cookies policies below:

 

top ]

 

Case Studies

Oasys Software has been used on thousands of interesting and exciting projects over the years. We would love to tell about all of them, but the confidentiality of our clients and their clients is paramount. We are especially grateful then to our clients who have taken the trouble to secure the required permissions and created the case studies below.

Analysing lateral movement in large diameter piles

Dr Naveen uses Oasys software to address the gap in codes when seeking an understanding of how larger diameter piles…

Read More
Stratford City – Bridge 20
Structural Analysis Stratford City – Bridge 20

Requirements The Stratford City project created a major new mixed-use urban centre on a former railway goods yard in Stratford,…

Read More
Infinity Bridge
Structural Analysis Infinity Bridge

With a main span of 120m, secondary span of 60m, and arch height of 40m, the award winning Infinity Bridge…

Read More
Bamboo Bridge
Structural Analysis Bamboo Bridge

Infranatural invited Bruce Danziger (Arup) to design a bamboo bridge for the Here there be monsters installation at the Materials and Applications research centre, Los…

Read More
Złote Tarasy, Warsaw, Poland
Structural Analysis Złote Tarasy, Warsaw, Poland

Złote Tarasy (Golden Terraces) takes its name from Złota (Golden) Street, one of the ‘metal streets’ established in the 18th…

Read More
The b-Shack
Structural Analysis The b-Shack

The b-Shack is a highly innovative beehive observation and study centre designed, fabricated and assembled by graduate students in the…

Read More
Pure tensegrity pavilion for Vision London

Visitors to Vision London, an event focussing on future of the built environment, were fascinated by the central pavilion designed by engineers…

Read More
Mauritius Commercial Bank
Structural Analysis Mauritius Commercial Bank

Arup engineered this Jean-Francois Koenig designed office building. The main features of its unusual form are: The floors: a set of flat…

Read More
MassMotion – A Step In The Right Direction

Arup has been involved in masterplanning the redevelopment of an existing site which includes a stadium with a maximum capacity…

Read More
Hafod Eryri – The summit of Mount Snowdon

At 3,560ft (1,085m) the café and visitor centre at the summit of Mount Snowdon in North Wales is the highest…

Read More
Grandstand of Chevreuse
Structural Analysis Grandstand of Chevreuse

This 300 seat grandstand is located in the Valley of Chevreuse, a suburban countryside region in the south of Paris.…

Read More
Block D24 development, Songdo, Korea

Songdo International Business District is on 1,500 acres (6 km²) of reclaimed land along Incheon’s waterfront, 40 miles (65 km) west…

Read More
Aspire Tower, Doha, Qatar
Structural Analysis Aspire Tower, Doha, Qatar

The centre piece of the 15th Asian Games was the Aspire Tower, shaped to represent a colossal torch, which for…

Read More
The Architecture of the Dragonfly Wing

The work presented herein is part of a technical paper co-authored by Maria Mingallon (Arup, Senior Structural Engineer) and Sakthivel Ramaswamy (KRR Engineering,…

Read More
Union Station, Toronto
Pedestrian Simulation Union Station, Toronto

Union Station is Toronto’s busiest transit facility, with current pedestrian volumes of over 30,000 individuals in the morning peak hour.…

Read More
Merseyrail
Pedestrian Simulation Merseyrail

Merseyrail is a train operating company and an urban rail network critical to Liverpool and its surrounding areas. It is…

Read More

Newsletter Sign up

Please fill out your details below to receive the latest oasys news.

  • This field is for validation purposes and should be left unchanged.