Terms & Conditions

Data Security

We are committed to ensuring that your information is secure. In order to prevent unauthorised access or disclosure we have put in place suitable physical, electronic and managerial procedures to safeguard and secure the information we collect.

All data is stored in secure electronic systems accessible only to Oasys staff with both valid network login credentials and specific authorisation to access the system.  Our systems further limit data access by role to ensure data is available only to those who have a specific need to see it.

If at any point you suspect or receive a suspicious communication from someone suggesting they work for Oasys or a website claiming to be affiliated with Oasys, please forward the communication to us or report the incident by email to [email protected] or in writing to Oasys, 8 Fitzroy Street, London, UK, W1T 4BJ as soon as possible.

Data Security Notice Updated 27th February 2020

top ]


 

Website Terms and Conditions

The contents of this web site are protected by copyright and other intellectual property rights under international conventions. No copying of any words, images, graphic representations or other information contained in this web site is permitted without the prior written permission of the webmaster for this site.

Oasys accepts no responsibility for the content of any external site that links to or from this site.

top ]

 


 

Software Licensing Terms

Terms and Conditions of Purchase

The full conditions of purchase and maintenance for all Oasys desktop software are set out in the Oasys Software Licence and Support Agreement.

The full conditions of purchase and maintenance for Oasys Gofer and Oasys Giraphe are set out in the Gofer SaaS Agreement  and the Giraphe SaaS agreement.

All prices are subject to TAX at the current rate.

Prices and specifications are subject to change without notice – please ask for a written quotation.

Although every care has been taken to ensure the accuracy of all information contained herein, the contents do not form or constitute a representation, warranty, or part of any contract.

Superseded Versions of Terms and Conditions

Oasys keeps copies of all superseded versions of its terms and conditions.

Maintenance & Support Services

Support and maintenance is included with all subscription licences for their full duration.

Annual maintenance contracts are available for software under a perpetual licence, prices are based on a percentage of the most recent list price.

This service includes:

 

top ]

 


 

Cookies Policies

View available cookies policies below:

 

top ]

 

Case Studies

Oasys Software has been used on thousands of interesting and exciting projects over the years. We would love to tell about all of them, but the confidentiality of our clients and their clients is paramount. We are especially grateful then to our clients who have taken the trouble to secure the required permissions and created the case studies below.

The Copenhagen Metro Circle Line

The Copenhagen Metro Circle Line consists of a 15.5km metro line with 17 underground stations. The stations were constructed as cut-&-cover…

Read More
Serpentine Gallery Pavilion, London

The Serpentine Gallery Pavilion was designed by Frank Gehry and Arup. It was erected in Hyde Park and was open to the public for one…

Read More
Crossrail
Geotechnical Crossrail

Deborah Lazarus, from Arup’s Advanced Technology & Research team, joined an English Heritage national planning and conservation team awayday to…

Read More
Case Study Video Overview – Soil Movement

A video presentation showcasing some projects that have utilised Xdisp, Pdisp and GSA.

Read More
Case Study Video Overview – Slope

A video presentation showcasing some projects that have utilised Slope.

Read More
Assessing the Influence of Soil Nail Parameters on the Stability of a Slope

Indian Institute of Technology (IIT), Bombay, have used Oasys Slope to carry out a study on the influence of soil…

Read More
Advanced Cut and Cover Tunnel Analysis

Requirements Following the construction of cut and cover tunnel sections, concerns were raised by the Client about drainage pipes cast…

Read More
A40 Lledr Valley Improvement

The widening and upgrade of 7.2km of the A470 Road, which runs along the Lledr Valley between North and South…

Read More
Port Quay Wall Assessments

A Port Authority wanted to gain an understanding of the likely impact from crane and bulk cargo loadings on a…

Read More
Innovative Deep Basement Design in Cavan, Ireland

Supporting a deep excavation adjacent to existing buildings and with limited working space is always a challenge. In Cavan, Ireland…

Read More
Pearl Tower – Temporary Shoring System Design

Emirates Pearl Hotel & Bab El Qasr Development Project is a specialised project as it is the deepest dig in…

Read More
Design of Willow Spiling

Using live willow as a material for slope and river bank stabilisation is both sustainable and environmentally friendly. However, willow spiling…

Read More
Case Study Video Overview – Frew

A video presentation showcasing some projects that have utilised Frew.

Read More
Estimate the Impact of Scouring on the Lateral Load Capacity of Piles

Bridges located in hilly terrains and resting on pile foundations are often subjected to significant scouring on account of fast…

Read More
Modelling Cyclic Loading of Piled Foundations

Cyclic loading of piled foundations has been the object of considerable research since the 1980s due to the use of…

Read More
Case Study Video Overview – Single Piles

A video presentation showcasing some projects that have utilised Alp. AdSec and Pile.

Read More

Newsletter Sign up

Please fill out your details below to receive the latest oasys news.

  • This field is for validation purposes and should be left unchanged.