Oasys Software is used for a wide variety of projects. Here is a sample of some of the exciting ways that our customers use our products:
|
National Aquatic Centre, Beijing, China The 'Water Cube' is deservedly one of the centre pieces of the Beijing Olympics 2008. GSA was key to the form-finding and analysis of the ETFE cladding as well as involvement in the initial frame design. |
|
|
GSA was central to the analysis and design of this award winning building for both the innovative central roof and the surrounding conventional buildings. |
|
|
The Maari oil fields are located some 100 kilometres off the west coast of New Zealand' North Island in the Taranaki basin. GSA was used to model the plated base, deck structures and model of the well head platform jacket structure |
|
|
Air Force Memorial, Washington DC Overlooking the Pentagon and adjacent to Arlington National Cemetery in Washington DC, the Air Force Memorial evokes the spirit of flight as its three glimmering stainless steel spires appear to soar to the heavens. |
|
|
The centre piece of the 15th Asian Games was the Aspire Tower, shaped to represent a colossal torch, which for the duration of the Games held its symbolic flame within the lattice shell that forms the topmost section. |
|
|
To increase the existing facilities of the well-known winter resort of Klingenthal, Vogtland District Council decided to build a modern ski jumping facility to meet the requirements of the International Ski Association (FIS). |
|
|
Melbourne Cricket Ground Redevelopment A requirement of hosting the 2006 Commonwealth Games was that the north side of MCG would undergo major redevelopment. The entire roof structure was modelled and analysed using GSA. |
|
|
Tensile Fabric Structures at Dalton Park Dalton Park is an outlet shopping centre that features a variety of fabric membrane canopies analysed by GSA |
|
|
Optimizing the design of a 5000 element structure using the COM interface between GSA and Excel. |
|
|
Yet another award winning building designed using GSA. |
|
|
When Gifford have a reinforcement detailing problem, they turn to CADrebar for the answer. |
|
|
How do you design a flexible bamboo bridge? With a flexible analysis program of course! |
|
|
Columbus Professional in Lloyds TSB At the sign of the Black Horse, Columbus is enabling Lloyds TSB to keep control of over 3000 complex projects. |
|
|
Static analysis? I think not! With 10 sculptures weighing up to seven tonnes moving along a river bridge, GSA provided a state-of-the-art solution. |
|
|
The Air Bridge at Gatwick Airport Building a bridge over a busy road is not easy, but when that road is carrying 747s at a major airport you need to plan the whole construction sequence very carefully. |
If you have an interesting project that you would like to showcase, we would love to hear from you. Please email us at oasys@arup.com